|
ASME
PEM TRADESHOW |
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Hours |
|
Room
A |
|
Room
B |
|
Room
C |
|
|
|
|
|
|
|
|
|
|
|
|
|
11:00
AM - 12:15 PM |
|
Engineering Ethics |
|
Engineering Ethics |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12:15
PM - 1:30 PM |
|
Motor Stator
Insulation Health Monitoring Michael
Thevanh |
|
Subsurface Hazard
Clearance of Boreholes and Excavations in Industrial Facilities |
|
Strain Gage Application
in Petrochem Plants Richard
Boswell, P.E. |
|
|
|
|
|
|
|
|
|
|
|
|
|
1:30
PM - 2:45 PM |
|
AeroTek Wear Pad Reduces Costs on Insulated Pipe |
|
Asset Integrity
Management of Pressurized Fixed Equipment |
|
Heat Exchanger Tube
Vibration: Basics & Advanced Life Prediction Methods |
|
|
|
|
|
|
|
|
|
|
|
|
|
2:45
PM - 4:00 PM |
|
Asset Management
Solutions to Overpressure Relief Devices |
|
Honing Risk Based
Inspection Analysis Through Real Time Process Data |
|
EZ™ Torque Gaskets |
|
|
|
|
|
|
|
|
|
|
|
|
|
4:00
PM - 5:15 PM |
|
Pre-Cured Composite
Sleeves for Preventive Maintenance |
|
When Cost &
Schedule are Critical, Flux Cored Arc Welding is the Solution |
|
Proactive Response to
Operational Changes using Integrity Operating Windows |
|
|
|
|
|
|
|
|
|
|
|